Sign In | Join Free | My himfr.com
Home > Asphalt Mixing Plant >

Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ

    Buy cheap Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ from wholesalers
     
    Buy cheap Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ from wholesalers
    • Buy cheap Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ from wholesalers
    • Buy cheap Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ from wholesalers

    Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ

    Ask Lasest Price
    Brand Name : Visbull
    Model Number : SLJ-10
    Certification : CE/SGS/ISO9001
    Price : Negotiation
    Payment Terms : D/A, D/P, L/C, T/T, Western Union, MoneyGram
    Supply Ability : 500set per month
    Delivery Time : 25-30working days after received your payment
    • Product Details
    • Company Profile

    Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ

    Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ


    10TPH Bitumen Concrete Mixer SLJ - 10 With 23KW Diesel Engine And 380V / 50HZ Power Supply

    10Tons Per Hour Asphalt Mixer SLJ-10


    Specifications:


    Productivity

    8-10 T / H

    Input Minerals capacity

    0.30M3/Barrel

    Suitable For

    bitumen, crushed stones

    Oil consumption

    6 kg / t

    Diesel Engine

    23kw

    Generator

    15kw

    Bitumen Tank Capacity

    700Kg

    Suitable fitting

    Tube mainframe

    4.0Kw

    Asphalt Pump

    2.0 Kw

    Stone lifting equipment

    3.0Kw

    Diesel Pump

    0.55Kw

    Dusting blowing fan

    3.0Kw

    Blowing fan

    4.0kW

    Output Minerals temperature

    120°C~180°C

    Dimension (LxWxH)

    4600 X 2300 X 3400mm

    Weight

    5.50 T


    Operation and Function


    The user should assign specific people who operate the machine and familiarize

    operation manual basically, and put the machine into project building after adjusting

    it to work regularly.


    Testing and preparation work before use


    a. Start cylinder motor, the tube is transferred, reverse cycle several times to check

    whether their operation is normal or any un-normal aspects.

    b. Lift the hopper, raise and down it again and again to make sure each component

    of every engine flexible and reliable, up and down smoothly, the hopper door open

    and close freely and position fixedly.

    c.Start all the ventilation blowers to inspect if there is any air leak inside the middle

    pipe.

    d. Inspect all bolts fasten or not, especially the gasket ring, reducer bearings,

    furnace body bearings, supporting roller bearings, and other parts.


    Whole set trial before production


    a. Filled the hopper with the mineral, asphalt tank should fill with hot asphalt

    (asphalt temperature must above 160 ℃), the diesel oil tank filled with diesel oil.

    b. Asphalt supply value adjustment:

    Needed time= needed time X 60 (second)

    c. Drying time set: due to temperature, moisture level of mineral aggregate, the

    impact of factors such as temperature and drying time required in a certain range

    adjustment may generally be adjusted in 200 to 260 seconds.

    d. Mixing time settings: general mixing time set around 60 seconds, can be uniform

    mixing.


    Natural operational procedure


    Generator output 380V, 50HZ three phase alternating current

    Inspect each phase position of electric motor to evaluate if it is up to the mustard

    Check the asphalt temperature reach 170 ℃ or not, so that asphalt pump can spray.

    After inspection, start the dust abatement draft fan, burning draft fan, then start

    cylinder and keep it running at the parch direction.

    Start lifter, pour inert solid into tube, discharge the hopper.

    Start the diesel pump, then press the ignition start, open oil pipe switch, after a few

    seconds to see whether the firing was successful, if unsuccessful, start the blower

    fan button, if not succeed, close the diesel pump and oil pipe switch, after 3 minutes

    do it again.

    g. When drying time arrived, stop diesel pump, the asphalt electric motor start by

    itself at the same time. Put hot asphalt into the cylinder body, through asphalt time

    relay cut off electrical asphalt motor automatically.

    h. When the setting of the mixing time over, the main motor cylinder cut off

    automatically.

    Then press out materials button, making the motor reversal, finished unloading

    materials until disposal to do so, a cycle ends here.

    i. Second to re-mix the material, from the “d” item start for the next cycle.


    Stands operation after the end of machine-team


    a. After the unit to make cylinder idling 3-5 minutes.

    b. Flicking the oil back switch, absorb the residual oil in the pipeline.

    c. Clean up the residual asphalt inside the asphalt pump

    d. Clean Asphalt pump use diesel cycle, open outer oil absorb port and hand spray

    gun valve, other valves closed.

    e. Close all motors and the diesel motor

    f. Discharge all the asphalt remaining in the asphalt tank.

    g. Release the dust in the Dust Collectors.


    Quality Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Wuhan Visbull Machinery Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)